Barrow-in-Furness, UK – BAE Systems is due to move a heavy load by road on Friday, 6 October.
A transport vehicle is due to leave the Central Yard at approximately 9.30am and travel down Bridge Road to the Devonshire Dock Complex.
The move will take around an hour and Cumbria Constabulary will operate a rolling roadblock while the move takes place, which may cause some disruption to road traffic.